The following documents outline the Instruction to Proponents (Tenderers) who intend to respond to St. Lucia Electricity Services Limited. (LUCELEC) Request for Proposals (RFP) for the Engineering, Procurement and Construction of a 7.5 MW/3.75 MWh Energy Storage System (ESS) to connect to the Vieux Fort Substation (VFSS).
- Addendum to RFP Documents
- 1 LUCELEC BESS Project (Instructions to Tenderers)
- Addendum 2
- Appendix 3-Price Schedules
- Appendix 5-Technical Schedules
- Schedule A - Battery Energy Storage System (BESS) Specification
- Schedule B - Power Conversion System (PCS) Specification
- Schedule C - Power Transformer Specification
- Schedule D - Energy Management System Specifications
- Schedule E - Electrical Balance of Plant and Installation Specifications
- Schedule F - Site Preparation and Civil Works Specifications
- Schedule G - Containerized Building Specification
- Schedule H - LUCELEC Design Criteria and Standards
- Schedule I - LUCELEC Safety Handbook
- Schedule J - Reference Reports and Drawings
- Schedule K - Packaging and Shipping Specification
- Schedule L - Contractor Datasheet
- Appendix 6 - Term Sheet